InfraVeritas360InfraVeritas360हिन्दीमराठीதமிழ்DPDPiq

DPDP Insights › Manufacturing › Internal audit department

DPDP for the Internal audit department in Manufacturing

Reviewed by InfraVeritas360 ResearchFirst published Last reviewed

Sources: DPDP Act, 2023 and DPDP Rules, 2025 (MeitY) · Ministry of Labour and Employment (PIB) · India Code; PRS summary · PIB · Kerala Factories and Boilers Department (copy of the Rules)

The internal audit team runs plant, depot and vendor audits. DPDP checks can be folded into each of them.

Written for: Internal audit department, Manufacturing. Open this seat in the interactive tool

What is different here

Plant audits can check gate notices, the medical room, locked registers and shift lists on notice boards. Vendor audits can check agency data schedules and deletion confirmations after exit. Depot and sales audits can check that dealer KYC and farmer lists are not kept on phones and chat groups.

The first four things to sort out

  1. Add a DPDP section to the plant audit checklist.
  2. Check that medical results are not in HR or contractor files.
  3. Ask agencies for signed data schedules and exit deletion records.
  4. Sample visitor and driver registers for a set period and locked storage.

A worked example

Internal audit department

DPDP checks in a routine plant audit

  1. Day 1Auditors check the gate notice and the visitor register. The register is on an open desk with pages going back two years.
  2. Day 1In the medical room, results are locked away, but one contractor's file holds full test reports. The plant head is told.
  3. Day 2A shift list with mobile numbers is found on a notice board and taken down.
  4. AfterFindings go into the plant audit report with owners and dates, and are checked at the next audit.

Evidence kept

  • Plant checklist
  • Findings with photos
  • Plant head response
  • Follow-up audit result

DPDP fits into the plant audit you already run.

What others in the sector usually do. Many audit teams start with the plant checklist, because the findings are visible and easy to fix.

Where it usually goes wrong, by organisation type

Organisation typeHotspots
Chemicals and petrochemicalsWorker health surveillance records; Hazardous goods driver and transporter records; Emergency plan contact lists shared with authorities
FertilisersFarmer Aadhaar authentication at retailer PoS; Farmer lists from meetings and agronomy apps; Dealer and retailer KYC records
Automotive and auto componentsConnected-vehicle location data; Dealer-shared buyer lists; Mechanic loyalty apps
FMCG and consumer goodsContest and promotion entries; Retailer app data; Agency-held consumer lists
Steel, metals and miningTownship and hospital records; Contract labour biometrics; Resettlement records
Cement and building materialsMason loyalty bank details; Driver records; Dealer KYC
Textiles and apparelAuditor access to worker files; Hostel records; Agency-held worker data
Food processing and dairyFarmer payment data; Collection centre registers; Consumer complaint records

10 questions the Internal audit department asks, answered in full

Contract workers, gate passes and biometrics: who is responsible for their data?

Short answer: You are, for data used at your plant; agencies act for you under contract

Your company decides why contract workers' data is collected at your plant: gate access, attendance, safety and the records the Labour Codes ask for. So for that data you are responsible, even when a manpower agency or contractor collects it. Agencies need a contract with data terms. Collect only what the gate and the law need, and delete biometric templates and photos when a worker leaves.

What the law says

Section 7 covers purposes of employment and duties under law. Section 8(1) keeps you responsible for processors. Section 8(7) asks for erasure when the purpose is over. Section 7 · Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 8(7) · Rule 8 · Section 5 · Rule 3

Steps
  1. List what is collected for each contract worker: ID, photo, biometric, bank details, medical fitness.
  2. Remove what the gate and the Labour Codes do not need.
  3. Give a short notice in the worker's language at enrolment.
  4. Add a data schedule to every agency and contractor contract.
  5. Delete templates and photos at exit; keep only the registers the law requires.
Evidence to keep
  • Enrolment field list with reasons
  • Notice in local languages
  • Signed agency data schedules
  • Exit deletion log
Common mistakes
  • Agencies keeping their own copies of Aadhaar cards
  • Templates of workers who left years ago
  • Worker lists shared with contractors on chat groups

Farmer Aadhaar authentication at the retailer's PoS: who is responsible for what?

Short answer: The scheme flow is the government's; your own farmer programmes are yours

Subsidised fertiliser is sold through PoS devices at retailers, with Aadhaar-based farmer authentication on iFMS, a government platform built by NIC for the Department of Fertilizers. The scheme decides why farmer identity is collected in that flow. Your company sees sales data from it and supplies the retailers. Treat any farmer-level data you see as personal data, use it only for supply and subsidy work, and never for marketing. For your own farmer meetings, soil testing and agronomy apps, you are the Data Fiduciary with full duties. Get a written legal view on your role.

What the law says

Section 4 needs a lawful basis for each use. Section 6 needs consent for your own programmes. Section 8(1) and 8(5) apply to any data your staff, dealers or vendors handle for you. Section 4 · Section 6 · Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 5 · Rule 3

Steps
  1. Write down which farmer data you see from the scheme, and which you collect yourself.
  2. Limit company dashboards and exports to what supply and subsidy work needs.
  3. Remind dealers and retailers not to keep Aadhaar copies or note numbers in registers.
  4. Give a notice and ask consent in your own farmer apps and meetings.
  5. Keep scheme data and marketing data apart in your systems.
Evidence to keep
  • Written role view
  • Dashboard access list
  • Dealer circular
  • Farmer app notice and consent records
Common mistakes
  • Using scheme purchase data to target offers
  • Retailers keeping Aadhaar photocopies
  • Farmer meeting registers kept for ever

Can a policy show that a control actually works?

Short answer: No; operation needs records

No. A policy shows what an organisation intends. It does not show that the control runs. To show operation you need records: a deletion log, an access review sign-off, a drill report, a sample of requests answered on time. Auditors and regulators look for these.

From your seat: Internal audit department. Test five samples end to end.
What the law says

Section 8(4) asks for appropriate technical and organisational measures to ensure compliance. Being able to show those measures work is part of meeting that duty. Section 8(5) · Rule 6 · Section 8(1)–(2)

Steps
  1. For each policy, write the record that would show it working.
  2. Check whether that record exists for the last quarter.
  3. Where it does not, start producing it.
  4. Sample a few records every quarter.
  5. Keep the samples with the policy.
Evidence to keep
  • Policy-to-record map
  • Quarterly samples
  • Gaps and actions
Common mistakes
  • Approving policies with no record behind them
  • Showing a policy when asked for evidence
  • Records that exist only before an audit

What evidence should exist before management accepts that we are ready?

Short answer: Evidence for each duty, not status colours

Before accepting a readiness statement, management should see evidence for each duty: dated notices, consent records, a request register with replies, signed vendor terms, access review sign-offs, log settings, a breach drill report and a deletion log. A status colour without these is a statement, not evidence.

From your seat: Internal audit department. Ask for the evidence list first.
What the law says

The Act places duties on the Data Fiduciary as an organisation. Management is accountable for whether they are actually met. Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 8(6) · Rule 7 · Section 8(9)–(10) · Rules 9, 14

Steps
  1. List the duties that apply.
  2. For each, name the piece of evidence that would satisfy an auditor.
  3. Ask owners to attach it.
  4. Mark duties without evidence as open, not ready.
  5. Review the list before each management sign-off.
Evidence to keep
  • Duty-to-evidence list
  • Attached evidence
  • Sign-off record
Common mistakes
  • Accepting 'done' without seeing anything
  • Counting policies as evidence
  • One sign-off and no review after

Which logs must we keep, for how long, and where?

Short answer: At least one year; 180 days of ICT logs in India

Keep logs that show who accessed personal data and what they did, for at least one year under the DPDP Rules. CERT-In separately asks for ICT system logs to be kept for 180 days within India. Logs must be protected so nobody can quietly change them.

From your seat: Internal audit department. Check logs exist for the period.
Example in Manufacturing

Gate, attendance and occupational health systems need logs kept for a year, and ICT logs 180 days in India.

What the law says

Rule 6 lists logs and monitoring as a minimum safeguard. Rule 8(3) asks for logs to be kept for at least one year. The CERT-In Directions of 2022 ask for 180 days of ICT logs kept within India. Section 8(5) · Rule 6 · Section 8(7) · Rule 8

Steps
  1. List systems holding personal data and what each logs today.
  2. Turn on access logging where it is missing.
  3. Send logs to one protected store, with at least one year of retention.
  4. Keep a copy of ICT logs in India for at least 180 days.
  5. Sync clocks and review alerts every day.
Evidence to keep
  • Log source list
  • Retention settings
  • Alert review records
Common mistakes
  • Logging only failures, not who viewed a record
  • Logs stored on the same server they describe
  • Clocks out of sync, so timelines cannot be built

Who should be able to see personal data in our systems?

Short answer: Only those who need it, reviewed every quarter

Only people who need it for their job, and only the part they need. Use named accounts, give access by role, review it every quarter and remove it on the day someone leaves. Watch privileged accounts closely.

From your seat: Internal audit department. Compare access lists with leavers.
Example in Manufacturing

Medical records and biometric data need named access. Supervisors get fitness notes, not results.

What the law says

Rule 6 names access control as a minimum safeguard, along with logs and monitoring that can detect misuse. Section 8(5) · Rule 6

Steps
  1. Write a role matrix for each key system.
  2. Replace shared logins with named accounts.
  3. Use multi-factor sign-in for admin and remote access.
  4. Review access every quarter with each manager.
  5. Remove access on the last working day.
Evidence to keep
  • Role matrix
  • Quarterly review sign-offs
  • Leaver removal report
Common mistakes
  • Generic logins on shared machines
  • Access that only grows
  • No review of vendor accounts

What must a vendor contract say about personal data?

Short answer: Yes, every vendor that touches personal data

You stay responsible for what your vendors do with personal data. The contract should say what data they get, for what purpose, the security they must keep, how fast they must tell you about an incident, that sub-contractors need your approval, and how data is returned or deleted at the end.

From your seat: Internal audit department. Read the top contracts.
Example in Manufacturing

Manpower agencies, contractors, canteen and medical centre operators, transporters, loyalty and telematics vendors.

What the law says

Section 8(1) keeps responsibility with you. Section 8(2) allows a processor only under a valid contract. Rule 6 asks for security terms in that contract. Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 8(6) · Rule 7 · Section 8(7) · Rule 8

Steps
  1. List vendors who receive or can see personal data.
  2. Rank them by how much and how sensitive.
  3. Add a data-protection schedule to each contract, starting with the top ten.
  4. Ask for evidence: certificates, test results, deletion confirmations.
  5. Review the top vendors every year.
Evidence to keep
  • Vendor register
  • Signed data-protection schedules
  • Annual review notes
Common mistakes
  • Relying on the vendor's standard terms
  • No incident-notice time
  • No exit and deletion clause

How long can we keep personal data?

Short answer: For the legal or business period, then erase

Keep data for as long as its purpose needs, or as long as a law requires, and then erase it. Every organisation must keep personal data and logs for at least one year under Rule 8(3). Write a retention schedule by record type, with the law or reason against each period.

From your seat: Internal audit department. Check one deletion run.
Example in Manufacturing

Set periods from the Labour Codes, the chemical rules and the fertiliser order, record type by record type.

What the law says

Section 8(7) asks for erasure when the purpose is over, unless a law requires retention. Rule 8(3) sets a one-year minimum for personal data, traffic data and logs. Section 8(7) · Rule 8 · Section 8(5) · Rule 6

Steps
  1. List the record types you hold.
  2. Write the period for each, with the law, regulator rule or business reason.
  3. Set a trigger for the period to start: end of relationship, date of transaction, exit date.
  4. Automate deletion where you can; for paper, schedule shredding.
  5. Keep a deletion log.
Evidence to keep
  • Retention schedule approved by Legal
  • Deletion log
  • Shredding or disposal certificates
Common mistakes
  • 'Keep everything forever' because storage is cheap
  • Deleting before the legal minimum
  • Forgetting email, shared drives and backups

How do we put DPDP into the risk register?

Short answer: One line per duty, with owner and evidence

Turn each duty into a risk line with an owner, a control, evidence and a review date. Map controls you already run for your regulator, auditors or certifications, so the same evidence serves several purposes. Track vendor risk separately.

From your seat: Internal audit department. Test each control.
Example in Manufacturing

Add agency, dealer network and plant system lines.

What the law says

The Act sets duties in Sections 5 to 12. A risk register shows management where each duty stands. Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 8(6) · Rule 7 · Section 10 · Rule 13

Steps
  1. List the duties that apply to you.
  2. For each, write the risk in plain words, the control and the owner.
  3. Link existing controls and audits as evidence.
  4. Rate likelihood and impact in your usual way.
  5. Review every quarter with management.
Evidence to keep
  • Risk register extract
  • Linked evidence
  • Quarterly review minutes
Common mistakes
  • One line saying 'DPDP compliance'
  • No owners
  • Evidence that is only a policy document

Something has gone wrong. What happens in the first 72 hours?

Short answer: Six hours for CERT-In; without delay for people and the Board; 72 hours for the detailed report

Contain it, then tell people. A reportable cyber incident goes to CERT-In within six hours of being noticed. Under DPDP, each affected person and the Data Protection Board must be told without delay, and the Board needs a detailed report within 72 hours. Sector regulators may have their own clock too.

From your seat: Internal audit department. Ask for drill findings.
Example in Manufacturing

A stolen gate server or a lost medical register is a breach. CERT-In's six hours and the DPDP steps may both apply.

What the law says

Section 8(6) and Rule 7 set the DPDP steps. The CERT-In Directions of 28 April 2022 set the six-hour report. A breach includes accidental disclosure and loss of access, not only hacking. Section 8(6) · Rule 7 · Section 8(5) · Rule 6

Steps
  1. Name one incident lead and a back-up, with phone numbers that work at night.
  2. Write the first-hour steps: isolate, preserve logs, tell the DPO and the incident lead.
  3. Keep ready-made drafts for CERT-In, the regulator, the Board and affected people.
  4. Decide in advance who signs off each message.
  5. Rehearse once a year with the people who would actually be called.
Evidence to keep
  • Incident plan with clocks
  • Rehearsal record
  • Incident log with times of each step
Common mistakes
  • Waiting to finish the investigation before telling anyone
  • Treating a wrong email or a lost laptop as 'not a breach'
  • Only IT knowing the plan

The sections you will use most

Other rules that sit alongside DPDP

RuleWhat it saysWhat it means alongside DPDPSource
Labour Codes (in force from 21 November 2025)The Code on Wages, 2019, the Industrial Relations Code, 2020, the Code on Social Security, 2020 and the Occupational Safety, Health and Working Conditions Code, 2020 came into force on 21 November 2025. Together they rationalise 29 earlier labour laws.Worker and contract labour records now follow the codes and the rules under them. Set retention for these records against the codes and state rules, not against the old Acts.Ministry of Labour and Employment (PIB)
Occupational Safety, Health and Working Conditions Code, 2020Subsumes earlier Acts including the Factories Act, 1948 and the Contract Labour (Regulation and Abolition) Act, 1970. Requires a free annual health examination for employees where prescribed, licences for those hiring contract labour, and registers kept in the prescribed form, electronically or otherwise.Gate passes, attendance, contractor registers and medical checks are legal records. DPDP adds access limits, security and deletion when the legal period is over.India Code; PRS summary
OSH Code: workers in hazardous processesPre-employment, periodic and post-exposure medical examinations are mandatory. Health records are mandatory and accessible to employees and inspectors. Hazardous establishments need an on-site emergency plan and six-monthly mock drills.Health records are among the most sensitive data a plant holds. The worker and the inspector may see them; supervisors and the wider HR team should not.PIB
Manufacture, Storage and Import of Hazardous Chemical Rules, 1989Rule 13: the occupier prepares and keeps up to date an on-site emergency plan, with a mock drill every six months and the report made available to the Authority. Rule 14: the Authority prepares the off-site emergency plan. Rule 15: the occupier informs persons outside the site about the hazard and safety measures.Emergency plans carry names and phone numbers of staff, contractors and authorities. Share them because the law asks, keep them current, and remove people who have left.Kerala Factories and Boilers Department (copy of the Rules)
Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996Set up Central, State, District and Local Crisis Groups. The District Crisis Group reviews occupiers' on-site plans while preparing the district off-site plan. The Local Crisis Group prepares the local emergency plan for the industrial pocket, educates the population likely to be affected and answers public inquiries.Contact lists you give the crisis groups are shared for a legal duty. Send only what the plan needs, through a channel you can show.FAOLEX (text of the Rules)
Direct Benefit Transfer in fertilisers (Department of Fertilizers)Sale of all subsidised fertilisers to farmers and buyers is made through Point of Sale (PoS) devices at retail shops. Beneficiaries are identified through documents such as Aadhaar, Kisan Credit Card or Voter ID. Subsidy is released to fertiliser companies on the basis of actual sales by retailers to beneficiaries.Farmer identity and purchase data move through retailers and a government system. Your company sees part of it. Use what you see only for the scheme and supply work.Department of Fertilizers
Integrated Fertilizer Management System (iFMS)A pan-India digital platform developed by NIC for fertiliser DBT. It includes Aadhaar-based farmer authentication at PoS, captures transactions at manufacturing, import and retail points, and subsidy is released after a sale is recorded at the retailer level.iFMS is the government's system. Company dashboards and exports drawn from it still need access control and logs on your side.National Informatics Centre
Fertiliser (Control) Order, 1985Dealers may sell only under an authorisation letter or certificate of registration (clauses 7 and 8). A retail dealer displays daily stock and prices (clause 4) and issues a cash or credit memo in Form M to the purchaser (clause 5). Records and returns in Form N are kept when the Controller directs (clause 35).Dealer authorisation papers and sale memos are dealer and farmer records. Your dealer KYC files and any farmer details on memos need the same care as other personal data.Government of Odisha (copy of the Order)
CERT-In Directions, 28 April 2022Report specified cyber incidents to CERT-In within six hours of noticing them. Keep logs of ICT systems for a rolling 180 days within India. Sync clocks to NIC or NPL time servers, or servers traceable to them.Applies to plants as well as head office. Keep this clock next to the DPDP breach steps in one plan.CERT-In
Explore our research-built assessment platformsDPDP Insights helps you understand the law. DPDPiq is where an organisation's evidence is assessed. Each platform comes out of the same Foundation Layer research. No AI, API or outside service is used when you use this site. Everything runs from InfraVeritas360's own server.