InfraVeritas360InfraVeritas360हिन्दीमराठीதமிழ்DPDPiq

DPDP Insights › Manufacturing › CTO / Engineering head

DPDP for the CTO / Engineering head in Manufacturing

Reviewed by InfraVeritas360 ResearchFirst published Last reviewed

Sources: DPDP Act, 2023 and DPDP Rules, 2025 (MeitY) · Ministry of Labour and Employment (PIB) · India Code; PRS summary · PIB · Kerala Factories and Boilers Department (copy of the Rules)

Your teams build and connect the systems that carry personal data: HRMS, gate and biometric systems, plant systems, dealer portals and, in some businesses, connected products.

Written for: CTO / Engineering head, Manufacturing. Open this seat in the interactive tool

What is different here

The same worker can appear in the gate system, the attendance device, HRMS and the medical centre software, linked by integrations that copy data both ways. Plant systems sit near control networks, and connected products send location and usage data to telematics platforms. DPDP needs consent flags, access logs kept at least a year and a delete path that runs across all of them.

The first four things to sort out

  1. Map integrations between HRMS, gate, attendance, medical and plant systems.
  2. Make exit in HRMS trigger deletion of templates and gate photos.
  3. Keep systems holding personal data apart from plant control networks.
  4. Build retention and consent by feature into the connected product platform.

A worked example

CTO / Engineering head

Integrating a new attendance system with HRMS and MES

  1. DesignA plant wants attendance data to flow into HRMS for wages and into MES for shift planning. The design review asks which fields each system needs.
  2. BuildMES receives token numbers and shift codes only. HRMS receives attendance hours. Biometric templates stay on the attendance server.
  3. LaunchThe attendance server sits on its own network segment, away from the control network, with logs kept at least a year.
  4. AfterA test confirms that exit in HRMS deletes the worker's template and gate photo within the set period.

Evidence kept

  • Design review record
  • Field list by system
  • Network diagram
  • Exit deletion test

Send each system only what it needs, and let exit clean up all of them.

What others in the sector usually do. Many engineering teams start by drawing one integration map for a pilot plant and fixing the copies it shows.

Where it usually goes wrong, by organisation type

Organisation typeHotspots
Chemicals and petrochemicalsWorker health surveillance records; Hazardous goods driver and transporter records; Emergency plan contact lists shared with authorities
FertilisersFarmer Aadhaar authentication at retailer PoS; Farmer lists from meetings and agronomy apps; Dealer and retailer KYC records
Automotive and auto componentsConnected-vehicle location data; Dealer-shared buyer lists; Mechanic loyalty apps
FMCG and consumer goodsContest and promotion entries; Retailer app data; Agency-held consumer lists
Steel, metals and miningTownship and hospital records; Contract labour biometrics; Resettlement records
Cement and building materialsMason loyalty bank details; Driver records; Dealer KYC
Textiles and apparelAuditor access to worker files; Hostel records; Agency-held worker data
Food processing and dairyFarmer payment data; Collection centre registers; Consumer complaint records

Control map: DPDP to NIST CSF 2.0 and ISO/IEC 27001:2022

DPDP dutyLawNIST CSF 2.0ISO/IEC 27001 Annex AEvidence
Know where personal data isSection 8(5) · Rule 6ID.AM-02, ID.AM-075.9, 5.12Inventory of systems and data types, with owner and hosting location
Only the right people get inSection 8(5) · Rule 6PR.AA-01, PR.AA-055.15, 5.16, 5.18, 8.2Role matrix, quarterly access review sign-off, leaver removal report
Strong sign-in for admins and remote usersSection 8(5) · Rule 6PR.AA-035.17, 8.5MFA enforcement report for admin, VPN and email accounts
Encrypt or mask dataSection 8(5) · Rule 6PR.DS-01, PR.DS-028.11, 8.24Encryption settings for databases, laptops, backups and transfers; masking in test copies
Keep and watch logsSection 8(5) · Rule 6PR.PS-04, DE.CM-01, DE.CM-038.15, 8.16, 8.17Log retention settings (one year; 180 days in India for CERT-In), alert rules, NTP source
Backups that restoreSection 8(5) · Rule 6PR.DS-11, RC.RP-038.13, 5.30Backup schedule, offline copy, last restore test with date and result
Separate networksSection 8(5) · Rule 6PR.IR-018.20, 8.22Network diagram showing segments, firewall rule review
Patch and fix weaknessesSection 8(5) · Rule 6ID.RA-018.8Vulnerability scan results and closure tracker
Handle incidents and tell peopleSection 8(6) · Rule 7RS.MA-01, RS.CO-02, RS.CO-035.24, 5.25, 5.26, 6.8Incident plan with the 6-hour and 72-hour steps, drill record, contact list
Learn from incidentsSection 8(6) · Rule 7DE.AE-02, ID.IM-015.27, 5.28Post-incident review and actions closed
Vendors protect data tooSection 8(1)–(2)GV.SC-05, GV.SC-075.19, 5.20, 5.22Contracts with data terms, vendor review record
Data comes back or is deleted at contract endSection 8(7) · Rule 8GV.SC-105.20, 8.10Exit clause and deletion certificate from the vendor
Cloud is set up safelySection 16 · Rule 15GV.SC-05, PR.DS-015.23Cloud region list, shared-responsibility note, configuration review
Delete when the purpose is overSection 8(7) · Rule 8PR.DS-018.10, 7.14Retention schedule, deletion log, disposal certificates for disks and paper
People know the rulesSection 8(5) · Rule 6PR.AT-016.3Training attendance and short test results by department
Legal duties are trackedSection 8(5) · Rule 6GV.OC-035.31, 5.34Register of laws and rules that apply, reviewed yearly
Roles are namedSection 8(9)–(10) · Rules 9, 14GV.RR-025.2, 5.4Named owners for each system and each duty, approved by management

Logs, backups and access checklist

10 questions the CTO / Engineering head asks, answered in full

Connected vehicles and product registration: what can we do with the data?

Short answer: For the service the buyer chose; anything more needs consent

Connected vehicles and smart products send location, usage and driving data, and registration gives you the buyer's contact details. Use it for what the buyer signed up for: warranty, recalls, safety and the services in the app. Sharing with insurers, finance partners or for marketing needs specific consent. Location data shows where people live and go, so keep only what each service needs.

What the law says

Section 6 needs specific consent for each purpose. Section 5 needs a notice. Section 16 applies if telematics data goes abroad. Section 5 · Rule 3 · Section 6 · Section 8(5) · Rule 6 · Section 8(7) · Rule 8 · Section 16 · Rule 15 · Sections 11–14 · Rule 14

Steps
  1. List the data each connected feature sends and why.
  2. Show the notice in the app and at delivery, by feature.
  3. Ask separately for insurer, partner and marketing sharing.
  4. Set retention for location history and trip data.
  5. Check where the telematics vendor stores and supports data.
Evidence to keep
  • Feature and data list
  • App notice and consent screens
  • Retention settings
  • Telematics vendor schedule
Common mistakes
  • Location kept for years by default
  • Dealer handing buyer lists to insurers
  • Telematics support from abroad with no contract terms

Dealer, retailer, mason and mechanic loyalty programmes: what do we need?

Short answer: Consent with a clear notice; collect only what rewards need

Loyalty schemes collect names, phone numbers, photos, ID and bank details to pay rewards. Joining is a choice, so this rests on consent with a clear notice. Collect only what rewards and tax rules need, keep bank details in one secure place, and make leaving the scheme easy. The loyalty vendor acts for you. Dealer KYC for appointment is a separate purpose from loyalty.

What the law says

Section 5 needs a notice. Section 6 sets what valid consent is, including easy withdrawal. Section 8(1) covers the loyalty vendor. Section 5 · Rule 3 · Section 6 · Section 8(1)–(2) · Section 8(5) · Rule 6 · Section 8(7) · Rule 8

Steps
  1. List the fields the app and forms collect, and drop what rewards do not need.
  2. Show a short notice at sign-up in the local language.
  3. Keep bank details in the payout system only.
  4. Add a data schedule to the loyalty vendor contract.
  5. Close and delete inactive members' data on a set period.
Evidence to keep
  • Field list with reasons
  • Sign-up notice and consent records
  • Vendor schedule
  • Inactive member deletion log
Common mistakes
  • Bank details in spreadsheets sent by email
  • Field staff enrolling masons without telling them
  • Loyalty data reused for unrelated offers

How do we build privacy into a new product or system?

Short answer: Four questions at design, then build the basics in

Ask four questions at the design stage: what personal data, why, for how long, and who sees it. Then build in what the Act assumes: a notice, consent where needed, role-based access, logs of record views, a way to delete, and a way to answer requests. Adding these after launch costs far more.

From your seat: CTO / Engineering head. Make the privacy questions part of design review, not a sign-off at the end.
What the law says

Sections 5 to 12 assume systems that can show notices, record consent, limit access, log, delete and answer requests. Section 5 · Rule 3 · Section 6 · Section 8(5) · Rule 6 · Section 8(7) · Rule 8 · Sections 11–14 · Rule 14

Steps
  1. Add the four questions to design templates.
  2. Drop data you do not need.
  3. Build access roles and record-view logs.
  4. Build deletion and request export.
  5. Register the system in the inventory at launch.
Evidence to keep
  • Design review records
  • Inventory entries
  • Deletion tests
Common mistakes
  • Privacy review only at launch
  • Collecting 'in case we need it'
  • No delete function

Where does personal data live in our organisation?

Short answer: Start with one row per system

Usually in more places than anyone expects: core systems, email, shared drives, laptops, vendor systems, backups, test copies, spreadsheets and paper. A simple inventory, one row per system, is the base for every other duty.

From your seat: CTO / Engineering head. Every new service should register itself in the inventory when it goes live.
Example in Manufacturing

Include gate systems, biometric devices, medical centre software, hostel registers and dealer apps.

What the law says

Every duty in Sections 5 to 12 assumes you know where the data is. Rule 6 needs safeguards for each system, and Section 11 needs you to find the data when someone asks. Section 8(5) · Rule 6 · Sections 11–14 · Rule 14 · Section 8(7) · Rule 8 · Section 3

Steps
  1. List systems, then shared drives, email, spreadsheets and paper stores.
  2. For each one, note whose data, which items, purpose, owner, hosting location and vendors.
  3. Add copies: backups, test, analytics.
  4. Get each owner to confirm their rows.
  5. Update it whenever a system is bought or retired.
Evidence to keep
  • Data inventory
  • Owner confirmations
  • Change log
Common mistakes
  • A 200-column spreadsheet nobody finishes
  • Leaving out SaaS tools bought by departments
  • No owner for each row

Does deletion have to reach backups and test copies?

Short answer: Yes, through a written backup-expiry rule

Deletion should reach every copy you control. For backups, the usual practice is to let deleted records expire with the normal backup cycle, never restore them into live use, and write this down. Test and training copies should use masked data.

From your seat: CTO / Engineering head. Design deletion and backup expiry together.
Example in Manufacturing

Gate and attendance servers at plants are often not backed up, or backed up for ever. Match backups to the schedule.

What the law says

Section 8(7) asks for erasure. Rule 6 asks for backups for continuity. The two meet in a backup retention rule that is short enough and written down. Section 8(7) · Rule 8 · Section 8(5) · Rule 6

Steps
  1. List where copies live: backups, replicas, test, analytics, laptops, vendors.
  2. Set backup retention to match the retention schedule.
  3. Write a rule: deleted records are not restored into live systems.
  4. Mask personal data in test and training copies.
  5. Get deletion confirmations from vendors.
Evidence to keep
  • Backup retention settings
  • Written backup-expiry rule
  • Masking procedure for test data
Common mistakes
  • Ten-year backups for convenience
  • Live copies in test
  • Restoring old backups and bringing deleted records back

Who should be able to see personal data in our systems?

Short answer: Only those who need it, reviewed every quarter

Only people who need it for their job, and only the part they need. Use named accounts, give access by role, review it every quarter and remove it on the day someone leaves. Watch privileged accounts closely.

From your seat: CTO / Engineering head. Role-based access belongs in the architecture, not in a later fix.
Example in Manufacturing

Medical records and biometric data need named access. Supervisors get fitness notes, not results.

What the law says

Rule 6 names access control as a minimum safeguard, along with logs and monitoring that can detect misuse. Section 8(5) · Rule 6

Steps
  1. Write a role matrix for each key system.
  2. Replace shared logins with named accounts.
  3. Use multi-factor sign-in for admin and remote access.
  4. Review access every quarter with each manager.
  5. Remove access on the last working day.
Evidence to keep
  • Role matrix
  • Quarterly review sign-offs
  • Leaver removal report
Common mistakes
  • Generic logins on shared machines
  • Access that only grows
  • No review of vendor accounts

Which logs must we keep, for how long, and where?

Short answer: At least one year; 180 days of ICT logs in India

Keep logs that show who accessed personal data and what they did, for at least one year under the DPDP Rules. CERT-In separately asks for ICT system logs to be kept for 180 days within India. Logs must be protected so nobody can quietly change them.

From your seat: CTO / Engineering head. Log who viewed a record, not only errors.
Example in Manufacturing

Gate, attendance and occupational health systems need logs kept for a year, and ICT logs 180 days in India.

What the law says

Rule 6 lists logs and monitoring as a minimum safeguard. Rule 8(3) asks for logs to be kept for at least one year. The CERT-In Directions of 2022 ask for 180 days of ICT logs kept within India. Section 8(5) · Rule 6 · Section 8(7) · Rule 8

Steps
  1. List systems holding personal data and what each logs today.
  2. Turn on access logging where it is missing.
  3. Send logs to one protected store, with at least one year of retention.
  4. Keep a copy of ICT logs in India for at least 180 days.
  5. Sync clocks and review alerts every day.
Evidence to keep
  • Log source list
  • Retention settings
  • Alert review records
Common mistakes
  • Logging only failures, not who viewed a record
  • Logs stored on the same server they describe
  • Clocks out of sync, so timelines cannot be built

Can personal data be stored or accessed outside India?

Short answer: Yes, unless a sector rule says otherwise

Under DPDP, yes, unless the government restricts a country, and none had been restricted when this page was last reviewed. A sector rule can be stricter, for example RBI's rule that payment system data must be stored only in India. Remote support access from abroad also counts as data going outside India.

From your seat: CTO / Engineering head. Know which regions and support teams each service uses.
Example in Manufacturing

Buyers' social audits, parent company HR systems and telematics platforms may hold data abroad.

What the law says

Section 16 allows transfers unless restricted, and keeps stricter sector laws in force. Rule 15 adds conditions on making data available to foreign states. Section 16 · Rule 15 · Section 8(1)–(2)

Steps
  1. List where each system is hosted and where support teams log in from.
  2. Check sector rules for localisation.
  3. Put location and access terms in cloud and vendor contracts.
  4. Keep the list current; new SaaS tools change it quietly.
  5. Tell people in your notice if data goes abroad.
Evidence to keep
  • Hosting and access-location list
  • Contract clauses
  • Sector rule check
Common mistakes
  • Forgetting email, CRM and helpdesk SaaS
  • Ignoring overseas support logins
  • Assuming 'Indian vendor' means 'data in India'

Do we process children's data, and what changes if we do?

Short answer: Check every channel; children often appear where you least expect

Anyone under 18 is a child under the Act. For a child's data you need verifiable consent from a parent or lawful guardian, and you must not track, behaviourally monitor or show targeted ads to children. Some classes and purposes are exempt under Rule 12 and the Fourth Schedule, for example healthcare to the extent needed to protect the child's health, and educational institutions for their educational work.

From your seat: CTO / Engineering head. Age checks and tracking switches must be possible in the product.
Example in Manufacturing

Product contests and school promotions may reach children. Parent consent and no targeted ads apply.

What the law says

Section 9 sets the duties. Rule 10 explains how to verify the parent. Rule 12 and the Fourth Schedule list the exemptions. Section 9 · Rules 10, 12 · Section 6

Steps
  1. Find where children's data enters: customers, dependants, interns, visitors, scholarships, app sign-ups.
  2. Decide whether an exemption in the Fourth Schedule applies to that purpose.
  3. Where none applies, add an age question and a parent-consent step.
  4. Switch off tracking and targeted ads for under-18 users.
  5. Record the decision for each channel.
Evidence to keep
  • Channel-by-channel note on children's data
  • Parent-consent records
  • Ad and tracking settings
Common mistakes
  • Assuming 'we are B2B, so no children'
  • Using the age 13 or 16 from foreign laws
  • Treating a tick-box from the child as parental consent

Do we need a Data Protection Impact Assessment?

Short answer: Required only for SDFs; good practice for high-risk changes

By law, only Significant Data Fiduciaries must do a yearly impact assessment. For everyone else it is good practice for high-risk changes: new tracking, profiling, large data sharing, children's data or moving data abroad. A short assessment before the change is cheaper than fixing it later.

From your seat: CTO / Engineering head. High-risk features need an assessment before build, not after launch.
What the law says

Section 10 and Rule 13 require a yearly impact assessment for Significant Data Fiduciaries. Section 10 · Rule 13 · Section 9 · Rules 10, 12 · Section 16 · Rule 15

Steps
  1. Define what counts as a high-risk change for you.
  2. Use a two-page template.
  3. Record the data, purpose, risks and safeguards.
  4. Get the DPO's view before approval.
  5. Keep it with the project record.
Evidence to keep
  • Assessment template
  • Completed assessments
  • DPO views
Common mistakes
  • Treating it as paperwork after launch
  • A 40-page template nobody completes
  • No trigger list

The sections you will use most

Other rules that sit alongside DPDP

RuleWhat it saysWhat it means alongside DPDPSource
Labour Codes (in force from 21 November 2025)The Code on Wages, 2019, the Industrial Relations Code, 2020, the Code on Social Security, 2020 and the Occupational Safety, Health and Working Conditions Code, 2020 came into force on 21 November 2025. Together they rationalise 29 earlier labour laws.Worker and contract labour records now follow the codes and the rules under them. Set retention for these records against the codes and state rules, not against the old Acts.Ministry of Labour and Employment (PIB)
Occupational Safety, Health and Working Conditions Code, 2020Subsumes earlier Acts including the Factories Act, 1948 and the Contract Labour (Regulation and Abolition) Act, 1970. Requires a free annual health examination for employees where prescribed, licences for those hiring contract labour, and registers kept in the prescribed form, electronically or otherwise.Gate passes, attendance, contractor registers and medical checks are legal records. DPDP adds access limits, security and deletion when the legal period is over.India Code; PRS summary
OSH Code: workers in hazardous processesPre-employment, periodic and post-exposure medical examinations are mandatory. Health records are mandatory and accessible to employees and inspectors. Hazardous establishments need an on-site emergency plan and six-monthly mock drills.Health records are among the most sensitive data a plant holds. The worker and the inspector may see them; supervisors and the wider HR team should not.PIB
Manufacture, Storage and Import of Hazardous Chemical Rules, 1989Rule 13: the occupier prepares and keeps up to date an on-site emergency plan, with a mock drill every six months and the report made available to the Authority. Rule 14: the Authority prepares the off-site emergency plan. Rule 15: the occupier informs persons outside the site about the hazard and safety measures.Emergency plans carry names and phone numbers of staff, contractors and authorities. Share them because the law asks, keep them current, and remove people who have left.Kerala Factories and Boilers Department (copy of the Rules)
Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996Set up Central, State, District and Local Crisis Groups. The District Crisis Group reviews occupiers' on-site plans while preparing the district off-site plan. The Local Crisis Group prepares the local emergency plan for the industrial pocket, educates the population likely to be affected and answers public inquiries.Contact lists you give the crisis groups are shared for a legal duty. Send only what the plan needs, through a channel you can show.FAOLEX (text of the Rules)
Direct Benefit Transfer in fertilisers (Department of Fertilizers)Sale of all subsidised fertilisers to farmers and buyers is made through Point of Sale (PoS) devices at retail shops. Beneficiaries are identified through documents such as Aadhaar, Kisan Credit Card or Voter ID. Subsidy is released to fertiliser companies on the basis of actual sales by retailers to beneficiaries.Farmer identity and purchase data move through retailers and a government system. Your company sees part of it. Use what you see only for the scheme and supply work.Department of Fertilizers
Integrated Fertilizer Management System (iFMS)A pan-India digital platform developed by NIC for fertiliser DBT. It includes Aadhaar-based farmer authentication at PoS, captures transactions at manufacturing, import and retail points, and subsidy is released after a sale is recorded at the retailer level.iFMS is the government's system. Company dashboards and exports drawn from it still need access control and logs on your side.National Informatics Centre
Fertiliser (Control) Order, 1985Dealers may sell only under an authorisation letter or certificate of registration (clauses 7 and 8). A retail dealer displays daily stock and prices (clause 4) and issues a cash or credit memo in Form M to the purchaser (clause 5). Records and returns in Form N are kept when the Controller directs (clause 35).Dealer authorisation papers and sale memos are dealer and farmer records. Your dealer KYC files and any farmer details on memos need the same care as other personal data.Government of Odisha (copy of the Order)
CERT-In Directions, 28 April 2022Report specified cyber incidents to CERT-In within six hours of noticing them. Keep logs of ICT systems for a rolling 180 days within India. Sync clocks to NIC or NPL time servers, or servers traceable to them.Applies to plants as well as head office. Keep this clock next to the DPDP breach steps in one plan.CERT-In
Explore our research-built assessment platformsDPDP Insights helps you understand the law. DPDPiq is where an organisation's evidence is assessed. Each platform comes out of the same Foundation Layer research. No AI, API or outside service is used when you use this site. Everything runs from InfraVeritas360's own server.